How to verify if a lesson does not respect a resource constraint?
To verify if the placement of a lesson does not respect the constraints of a subject, a teacher, a class or the hourly maximum of a resource:
- From the display
Timetable of one of the resources, select the lesson and click on it to switch to diagnostic mode. - Move the green frame to the wanted slot:
- If the Weekly Hourly Maximum of a resource is exceeded, the symbol
is displayed on the front on the lesson form. - If the Daily Hourly Maximum of a resource is exceeded, the symbol
is displayed on the front on the lesson form. - If the Maximum number of days of presence per year of a resource is exceeded, the symbol
is displayed on the front on the lesson form. - If the Maximum number of days of presence per week of a resource is exceeded, the symbol
is displayed on the front on the lesson form. - If the subject incompatibility is not respected, the symbol
is displayed in front of the concerned resource. - If the previous lesson or the following lesson is on another site and that the travel time is not respected, the symbol
is displayed in front of the concerned resource. - If the lesson encroaches on the inter-lesson, a symbol
is displayed on the price sheet, in front of the concerned resource. - If one of the resources is unavailable on this slot, a pale red square
is displayed in front.
- If the Weekly Hourly Maximum of a resource is exceeded, the symbol